Overview

A two-EV household in Redmond needed to charge both cars overnight, but their panel didn't have room for two more 240V circuits. Smart load management let us install both Level 2 chargers in a single afternoon — no panel upgrade required.

The challenge

Two dedicated 240V charging circuits would have pushed the existing panel past its limit, normally forcing an expensive service upgrade before any chargers could go in.

What we did

We installed both chargers on a shared, load-managed circuit that intelligently splits available capacity between the two cars. Cables were routed cleanly along the garage wall, and both units were commissioned and app-connected.

Results

  • Two Level 2 chargers added with no panel upgrade
  • Load management balances power between both vehicles
  • Clean, wall-mounted cable routing in the garage
  • Completed in a single half-day visit

Services used

More work

Related projects

  • Panel Upgrades

    Residential

    200A Panel Upgrade

    Replaced an aging 100A panel with a 200A service to support an EV charger and heat pump.

    Bellevue, WAView project
  • Commercial Electrical

    Storefront

    Retail Lighting Retrofit

    Full LED retrofit and new circuiting for a 4,000 sq ft retail space, completed off-hours.

    Seattle, WAView project
  • Wiring & Rewiring

    1940s Residential

    Whole-Home Rewire

    Replaced knob-and-tube wiring with modern, grounded circuits across a full remodel.

    Ballard, Seattle, WAView project

Have a similar project in mind?

Tell us what you're planning and we'll follow up with a clear, upfront estimate — usually the same day.

Get Instant Estimate